Skip to main content
Conference Proceedings

12th AusIMM Underground Operators' Conference 2014

Conference Proceedings

12th AusIMM Underground Operators' Conference 2014

PDF Add to cart

Sublevel Shrinkage - the Mt Wright Story

The Mt Wright Underground Mine is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold - a wholly owned subsidiary of Resolute Mining Limited. Following the evolution of the mine plan through a number of stages, the sublevel shrinkage (SLS) with continuous fill' mining method was implemented in 2010 to extract the Mt Wright orebody. The production front in this mining method is similar to a sublevel cave (SLC) operation; however, backfill is placed into the top of the production zone as opposed to requiring the overlying strata to cave.Continuous fill to replace the void created by extracting the ore was required to manage the potential risks associated with the proximity of infrastructure to the footwall, associated long-term stability and air blast potential due to the limited cavability' of the material within the cave zone. The available fill material was sourced from a disused waste dump from a previous open pit operation, which introduced further technical and economic risks associated with dilution from no grade' broken material. Procedures and processes to manage these risks have been incorporated into the operation of the mine.Despite encountering a number of challenges, the SLS method has been in use for approximately three years at Mt Wright and has proven to be viable economically, technically and operationally. This paper will discuss the challenges encountered and what was done to overcome them, the operational and financial performance to date, along with the outcomes of some successful continuous improvement projects that have improved the efficiency of the operation.CITATION:Mackay, D, Long, S and Koen, A J, 2014. Sublevel shrinkage - the Mt Wright story, in Proceedings 12th AusIMM Underground Operators' Conference 2014 , pp 205-216 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Sublevel Shrinkage - the Mt Wright Story
    PDF
    This product is exclusive to Digital library subscription
  • Sublevel Shrinkage - the Mt Wright Story
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2014
  • PDF Size: 4.387 Mb.
  • Unique ID: P201402025

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.