The Tugun Bypass Tunnel in Gold Coast, Australia was constructed using diaphragm walls with the top-down cut-and-cover method to allow simultaneous construction of an airport runway extension above the tunnel, whilst excavation of the tunnel continued underneath. The tunnel was built in an environment of high groundwater table and deep deposits of alluvial and estuarine soils with the toes of the walls founded in soil deposits. There was a potential risk for differential settlements to occur between the diaphragm wall panels, caused by the runway fill placed over the tunnel roof during excavation._x000D_
Dewatering within the diaphragm walls was required to facilitate the construction of the tunnel. The tunnel was also built in an area where environmental considerations were of great importance. Three-dimensional numerical modelling was undertaken to predict the differential settlements of the tunnel with considerations of varying subsurface profile, staged excavation and dewatering, non- uniform surface loading and complex soil-structure interaction. Field instrumentation and monitoring was implemented to confirm numerical predictions._x000D_
Dewatering within the diaphragm walls was required to facilitate the construction of the tunnel. The tunnel was also built in an area where environmental considerations were of great importance. Three-dimensional numerical modelling was undertaken to predict the differential settlements of the tunnel with considerations of varying subsurface profile, staged excavation and dewatering, non- uniform surface loading and complex soil-structure interaction. Field instrumentation and monitoring was implemented to confirm numerical predictions._x000D_
Contributor(s):
J Hsi, S Lambert, M Thomas
-
Tugun Bypass Tunnel Using Top-Down Cut-and-Cover MethodPDFThis product is exclusive to Digital library subscription
-
Tugun Bypass Tunnel Using Top-Down Cut-and-Cover MethodPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2008
- PDF Size: 0.934 Mb.
- Unique ID: P200803004