Skip to main content
Conference Proceedings

15th Australasian Tunnelling Conference 2014

Conference Proceedings

15th Australasian Tunnelling Conference 2014

PDF Add to cart

Design and Construction for the Widening of the M2Norfolk Twin Tunnels

The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney's road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length of the motorway. The project involved widening the twin tunnels to provide a third lane and breakdown lane in each direction.The widening of the tunnels was fundamentally different to other greenfield' tunnel projects in that the operation of the tunnel was maintained throughout construction, with motorway traffic permitted close to the excavation faces on a daily basis. The widened works had to integrate with the existing tunnel support, construction details, and mechanical and electrical infrastructure.The existing tunnel afforded the opportunity to review existing ground conditions in the tunnel. Exposures were mapped within the tunnel, and key design parameters were back-analysed from the original monitoring data to provide increased confidence in the assessed impact from the widening works.Traffic capacity of the tunnels was maintained by detailed staging of the works, and included the ability to reopen the tunnels at short notice.A permit to tunnel system was developed to manage the risks associated with re-opening the tunnel to traffic. A comprehensive suite of instrumentation was maintained to provide reliable monitoring data to support this process. Emphasis on the robustness and reliability of tunnel instrumentation provided increased confidence in the adequacy of the tunnel support being installed. The monitoring was routinely compared with design predictions to check the adequacy of the support measures being installed and confirm the design.The approaches and methodologies developed for the widening of the Norfolk Tunnels were effective in maintaining the safe operation of the tunnels throughout the two years of construction, and provide a framework for increasing the capacity of existing tunnel infrastructure in the future.CITATION:Clarke, S J, de Ambrosis, A L, Bertuzzi, R and Redelinghuys, J, 2014. Design and construction for the widening of the M2 Norfolk Twin Tunnels, in Proceedings 15th Australasian Tunnelling Conference 2014 , pp 591-602 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Design and Construction for the Widening of the M2Norfolk Twin Tunnels
    PDF
    This product is exclusive to Digital library subscription
  • Design and Construction for the Widening of the M2Norfolk Twin Tunnels
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2014
  • PDF Size: 3.898 Mb.
  • Unique ID: P201411067

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.