Skip to main content
Conference Proceedings

1992 AusIMM Annual Conference The State of the Art - A Product of 100 Years of Learning

Conference Proceedings

1992 AusIMM Annual Conference The State of the Art - A Product of 100 Years of Learning

PDF Add to cart

Planning for an Integrated Dump Leach and CIP Operation at Mt Gibson Gold Mine

A case study examining the procedures and financial benefits of introducing dump leaching to augment the Mt Gibson Gold Project CIP operations is discussed. Metallurgical testwork, followed by pilot dump leach operations, confirmed that gold recoveries of greater than 60 per cent could be achieved by dump leaching Mt Gibson laterite ore. Capital and operating costs were determined. Pit optimisation using the Whittle FOUR-D optimisation program calculated an optimum cutover grade between CIP and dump leaching for one orebody. The resultant recalculation of reserves based on CIP and dump leach operating costs showed that reserves for that orebody could be increased from 329 000 tonnes at 1.9 g/t An, to 1 488 000 tonnes at 1.2 gh An. NPV for the CIP only option of $1.4 m, was increased to $4.0 m for the combined CIP/dump leach option. This technique can be applied to existing gold projects and to new Developments.
Return to parent product
  • Planning for an Integrated Dump Leach and CIP Operation at Mt Gibson Gold Mine
    PDF
    This product is exclusive to Digital library subscription
  • Planning for an Integrated Dump Leach and CIP Operation at Mt Gibson Gold Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1992
  • PDF Size: 0.532 Mb.
  • Unique ID: P199202023

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.