Conference Proceedings
1992 AusIMM New Zealand Branch Annual Conference
Conference Proceedings
1992 AusIMM New Zealand Branch Annual Conference
Alluvial Gold in the Clyde Power Project Area: Some Observations on the Origin, Distribution and Age of the Deposits
The Clyde Power Project, and its Clutha Valley Development forerunner, has taken widespread investigations for various hydroelectric purposes both along the valley floors upstream from Alexandra and on the higher schist terrain. As part of this work the nature and extent of many of the alluvial deposits have been resolved and the ages established withvarying precision. Gold values have been approximately appraised in some areas as an element of environmental assessment.
Contributor(s):
R Thomson
-
Alluvial Gold in the Clyde Power Project Area: Some Observations on the Origin, Distribution and Age of the DepositsPDFThis product is exclusive to Digital library subscription
-
Alluvial Gold in the Clyde Power Project Area: Some Observations on the Origin, Distribution and Age of the DepositsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1992
- PDF Size: 0.293 Mb.
- Unique ID: P199212015