Landslide Stabilisation at the Clyde Power Project: A Major Geotechnical Undertaking

Construction work on one of the world's largest landslide stabilisation projects is drawing to a close in Central Otago. Begun in mid 1990, major stabilisation work has been carried out on seven large rockslides which will be partially inundated when the Clyde dam reservoir (Lake Dunstan) is filled. The work has required the construction of 14.5 kilometres of tunnel, 60 kilometres of surface drilling, 78 kilometres of drilled drainage holes and five million cubic metres of earthworks. The stabilisation programme has been carried out by the Electricity Corporation of New Zealand as part of the Clyde Power Project, a hydroelectric development on the Clutha River.
Return to parent product
  • Landslide Stabilisation at the Clyde Power Project: A Major Geotechnical Undertaking
    PDF
    This product is exclusive to Digital library subscription
  • Landslide Stabilisation at the Clyde Power Project: A Major Geotechnical Undertaking
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1992
  • PDF Size: 0.859 Mb.
  • Unique ID: P199212044

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.