Conference Proceedings
1992 AusIMM New Zealand Branch Annual Conference
Conference Proceedings
1992 AusIMM New Zealand Branch Annual Conference
The Nokomai Gold Mining Project
The Nokomai Gold Mining Project commenced production in January 1992. The Project continues a history of mining in theNokomai Valley which extended from 1863 to 1942. L & M Mining Limited have held interests in the valley since 1980. In 1990 the Nokomai Joint Venture was formed with the Hore family, the owners of Nokomai Station, to mine a large alluvial gold resource in the valley. The mine is located adjacent to the Mataura Brown Trout fishery and required extensive environmental studies prior to granting of permits. The mine is budgeted to work for 20 months, processing 460 000 m3 of wash material. During this period, contract miners, Downer Mining Limited, will move in excess of seven million cubic metres of overburden from the deposit.
Contributor(s):
D Manhire, G Boyd
-
The Nokomai Gold Mining ProjectPDFThis product is exclusive to Digital library subscription
-
The Nokomai Gold Mining ProjectPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1992
- PDF Size: 1.98 Mb.
- Unique ID: P199212002