Skip to main content
Conference Proceedings

1998 AusIMM Annual Conference - The Mining Cycle

Conference Proceedings

1998 AusIMM Annual Conference - The Mining Cycle

PDF Add to cart

Finding a Mine Within a Mine - The Mount Isa Lead/Zinc Case Study

Over the last 15 years the silver/lead/zinc ore treated at Mount Isa became increasingly complex and lower grade. Metal recoveries dropped dramatically, causing a serious decline in profitability. The traditional' response of increasing tonnage to reduce unit cost was unsuccessful, since the additional tonnage was even lower quality ore. A major technical and capital program in the 1990s restored metallurgical performance, but business return was still too low and ore quality continued to decline. In 1996 a new, holistic approach integrated the steps of geology, mining, concentrating, smelting, and refining. Previous assumptions about fixed' and marginal' costs in mining and processing were shown to be wrong. Detailed analysis showed that some ore sources were reducing profit. This led to a fundamental redesign and downsizing of both Mount Isa and Hilton mines. The result was dramatic increases in head grades, metallurgical performance and plant stability without any capital expenditure. The business is now smaller, but more profitable.
Return to parent product
  • Finding a Mine Within a Mine - The Mount Isa Lead/Zinc Case Study
    PDF
    This product is exclusive to Digital library subscription
  • Finding a Mine Within a Mine - The Mount Isa Lead/Zinc Case Study
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1998
  • PDF Size: 0.856 Mb.
  • Unique ID: P199802046

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.