Scoping of Feasibility Studies
                            
How often does one hear that a recent feasibility study was not a success? Alternatively, when scope of the feasibility study was sent out to tender there was a large discrepancy in tendered prices._x000D_
If the tendered prices were to be compared to the consumer market, for instance the purchase of a car, where the concept is transport in a controlled and safe manner, prices vary by large factors, but then so do the specifications. In the case of a feasibility study, prices should be within a tighter margin as the tenderers are all quoting against the same concept and specification. Why do these discrepancies occur? Price discrepancies will in every likelihood be attributed to two main factors; one, the perceived amount of work and two, the ability of the bidder to carry the risk associated with the feasibility study. It is, therefore, important that the scoping of the feasibility study covers the detailed requirements as clearly as possible stating what level of accuracy is required._x000D_
The feasibility study is one of the first activities in the life of a project. The study, like the project it is investigating, is subject to the constraints of time, cost and quality. Its primary objectives are to demonstrate the viability of a project within the outlined scope and constraints.
                    
                        If the tendered prices were to be compared to the consumer market, for instance the purchase of a car, where the concept is transport in a controlled and safe manner, prices vary by large factors, but then so do the specifications. In the case of a feasibility study, prices should be within a tighter margin as the tenderers are all quoting against the same concept and specification. Why do these discrepancies occur? Price discrepancies will in every likelihood be attributed to two main factors; one, the perceived amount of work and two, the ability of the bidder to carry the risk associated with the feasibility study. It is, therefore, important that the scoping of the feasibility study covers the detailed requirements as clearly as possible stating what level of accuracy is required._x000D_
The feasibility study is one of the first activities in the life of a project. The study, like the project it is investigating, is subject to the constraints of time, cost and quality. Its primary objectives are to demonstrate the viability of a project within the outlined scope and constraints.
                                    
                                        Contributor(s):
                                    
                                    A E A Northcote
                                
                            - 
                                                            SubscribeScoping of Feasibility StudiesPDFThis product is exclusive to Digital library subscription
- 
                                                            Add to cartScoping of Feasibility StudiesPDFNormal price $22.00Member price from $0.00Fees above are GST inclusive 
                                        
                                        PD Hours
                                    
                                    
                                        
                                            Approved activity
                                        
                                    
                                - Published: 1998
- PDF Size: 0.097 Mb.
- Unique ID: P199802014