Design, Construction, Commissioning And Operating Of the Elura Concentrator
This paper describes major events in the design, construction, camtissioning and operation of the Elura concentrator. It covers the period fran September, 1974 when laboratory testwork on drill core cotmenced to March, 1983 when the concentrator catmenced operation on run of mine ore following successful completion of initial ccnmissioning tests. The concentrator was designed to treat 1.1 million tonnes of lead-zinc-silver ore per year with a plant availability of 89 per cent. This treatment rate has been achieved for test periods.
Contributor(s):
P J O'Dwyer, R D Morrison
-
Design, Construction, Commissioning And Operating Of the Elura ConcentratorPDFThis product is exclusive to Digital library subscription
-
Design, Construction, Commissioning And Operating Of the Elura ConcentratorPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1983
- PDF Size: 0.346 Mb.
- Unique ID: P198302009