Conference Proceedings
Annual Conference, Broken Hill
Conference Proceedings
Annual Conference, Broken Hill
Planning & Design Of New Tailing Disposal Facilities At ZC/NBHC
The present The Zinc ODrporation, Limited and New Broken Hill Consolidated Limited (ZC/NBHC) tailing dam (Site C) is expected to reach its terminal capacity late in 1985._x000D_
Planning and design of new facilities for disposal of tailing after 1985 which includes new tailing dams (Site D) commenced during 1980. This paper briefly describes planning guidelines and specifications, location considerations, environmental aspects, operating strategy, engineering specifications, envirormental aspects and scheduling of works.
Planning and design of new facilities for disposal of tailing after 1985 which includes new tailing dams (Site D) commenced during 1980. This paper briefly describes planning guidelines and specifications, location considerations, environmental aspects, operating strategy, engineering specifications, envirormental aspects and scheduling of works.
Contributor(s):
J R Kelly, P J Lean
-
Planning & Design Of New Tailing Disposal Facilities At ZC/NBHCPDFThis product is exclusive to Digital library subscription
-
Planning & Design Of New Tailing Disposal Facilities At ZC/NBHCPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1983
- PDF Size: 0.678 Mb.
- Unique ID: P198302022