Conference Proceedings
Annual Conference, New Zealand
Conference Proceedings
Annual Conference, New Zealand
Cemented Fill Practice and Research at Mount Isa
This paper considers three aspects of cemented fill practice and research in Mount Isa. Firstly, an account is given of the use of Portland cemented hydraulic fill, considering mainly the role and specifications of the fill used but including brief description of fill preparation and placement. Data resulting from a Portland cemented hydraulic fill sampling, curing and cesting campaign covering about 18 months of operating practice are presented, analysed and discussed. These yield information indicating the mode of operation of a fully-automated fill preparation station, as well as a means of comparing field and laboratory strength results. A technique with potential for use as a fill quality control without actual strength testing is also described. Results of a fill research programme conducted by the author in Mount Isa since early 1968 are presented, involving both Portland cemented hydraulic fill and altei._acive, cheaper, additives for cementing hydraulic Fill.
Contributor(s):
E G Thomas
-
Cemented Fill Practice and Research at Mount IsaPDFThis product is exclusive to Digital library subscription
-
Cemented Fill Practice and Research at Mount IsaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1980
- Unique ID: P198001006