Skip to main content
Conference Proceedings

Annual Conference, New Zealand

Conference Proceedings

Annual Conference, New Zealand

PDF Add to cart

Mining A 100 Million Tonne Orebody Without Subsidence

The major copper orebody at Mount Isa is being extracted at a rate of four million tonnes per year. The method used requires an equivalent rate of back filling with (mainly) cemented fill. There were three major incentives for developing this mining system. The first was the prospect of high ultimate recovery of the orebody. The target is 100% recovery. Also the proposed stoping layout appeared to offer significant advantages in development and production costs. Finally, extensive subsidence above the northern end of the orebody could have disturbed permanent surface installations and jeopardised a possible future open cut. The full implications of this ambitious strategy were not apparent in the early years._x000D_
Now, after twelve years of production the benefits are being realised and they can be weighed against the costs. Probably the most interesting result which comes from this analysis is the significance of cutoff grades and dilution factors in balancing mining and filling rates.
Return to parent product
  • Mining A 100 Million Tonne Orebody Without Subsidence
    PDF
    This product is exclusive to Digital library subscription
  • Mining A 100 Million Tonne Orebody Without Subsidence
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1980
  • PDF Size: 0.521 Mb.
  • Unique ID: P198001015

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.