Sydney is the capital city of NSW and has a population of approximately four million people. Eighty per cent of the city's water is supplied by Warragamba Dam, which is situated some 75 kilometres south west of the city centre. A risk assessment was carried out on the dam and future predictions of water flows into the catchment area showed that there was a risk of a one in 700-year flood not being contained by the dam. The predicted loss of life and property damage warranted the construction of an auxiliary spillway on the eastern side of the existing dam to cater for any uncontrollable influx of water. A test blasting program was instigated and the blasting parameters were established that would lead to routine production blasting of the sandstone rock making it more cost effective to excavate. Blast induced vibrations were a concern to the owners and the dam wall and ancillary infrastructure was instrumented with sensitive vibration monitoring equipment during the test blasting phase of the operation. Once the blasting parameters were established from the testing program production blasting was carried out on a daily basis to maintain stockpile' of fragmented ground for the excavation equipment. Blast vibration models were developed to predict vibration levels for more sensitive areas of the dam to give the operators more confidence in their operations. The blast induced vibration levels recorded did not cause any structural damage to the dam wall and the waveform frequencies of the blasting operation were much higher than that experienced during a recent earthquake. The integrity of the SCA's assets were at no time jeopardised.
Contributor(s):
A Brodbeck, D P Blair, L W Armstrong, P Walton
-
No Dam Leaks: The Challenge of Blasting the Warragamba Dam Auxiliary SpillwayPDFThis product is exclusive to Digital library subscription
-
No Dam Leaks: The Challenge of Blasting the Warragamba Dam Auxiliary SpillwayPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2001
- PDF Size: 0.152 Mb.
- Unique ID: P200104021