Skip to main content
Conference Proceedings

Fifth Large Open Pit Mining Conference

Conference Proceedings

Fifth Large Open Pit Mining Conference

PDF Add to cart

In-Pit Crushing and Conveying System and Dexin Pit Copper Haulage Optimisation for Ore Transport

The output of Dexin Pit Copper is up to 33 million tonnes a year and the final depth is more than 500 m. As a cost reduction measure, the in-pit crushing and conveying system has was introduced to deliver ore from the pit to mills. This paper describes the in-pit crushing and conveying system, and highlights the optimum level where the shovel-truck haulage system transfers into In-pit Crushing and Conveying system, relocation of an in-pit crushing system, and includes the impact of the transferring point when the costs change.
Return to parent product
  • In-Pit Crushing and Conveying System and Dexin Pit Copper Haulage Optimisation for Ore Transport
    PDF
    This product is exclusive to Digital library subscription
  • In-Pit Crushing and Conveying System and Dexin Pit Copper Haulage Optimisation for Ore Transport
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2003
  • PDF Size: 0.203 Mb.
  • Unique ID: P200307001

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.