Conference Proceedings
Fifth Large Open Pit Mining Conference
Conference Proceedings
Fifth Large Open Pit Mining Conference
Mining Through Underground Workings in Fimiston Open Pit Kalgoorlie Consolidated Gold Mines (KCGM)
The Kalgoorlie Consolidated Gold Mines (KCGM) Fimiston Open Pit is located on the eastern boundary of the Kalgoorlie-Boulder City and is mining an area traditionally known as the Golden Mile. The pit area has been continuously worked since 1893, predominantly by underground mining methods and more recently through open cut mining. There are over 2000 km of old mine headings and numerous stopes under the open pit area. KCGM has interpreted and digitised the underground mine plans and stope sections into a common database. A 2D-model software package, called Pits, was developed in-house and allows old workings to be displayed at any bench level; this is integrated with 3D Vulcan modelling software, which allows triangulated surfaces to be displayed. Almost every mining activity is affected by underground workings. The effective management of the interaction between current mining and the underground workings is very important for safety and production. A specific void' management department has been formed and its broad objective is to minimise the impact of underground workings upon production while maximising safety. Special criteria and procedures have been developed and implemented to keep personnel and machinery from being exposed to unsafe ground. It is of primary importance to accurately define the location and outline of underground workings in advance. Probe drilling has been used as the key tool for that purpose. Various geophysical methods have also been trialled on site to detect underground workings; these are discussed in some detail. This paper discusses void' management issues such as data integration, void detection and flagging. The impact of underground workings on mine planing, production and slope stability is also discussed.
Contributor(s):
J Jiang, K Karunaratna, T Jones
-
Mining Through Underground Workings in Fimiston Open Pit Kalgoorlie Consolidated Gold Mines (KCGM)PDFThis product is exclusive to Digital library subscription
-
Mining Through Underground Workings in Fimiston Open Pit Kalgoorlie Consolidated Gold Mines (KCGM)PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2003
- PDF Size: 0.975 Mb.
- Unique ID: P200307032