Skip to main content
Conference Proceedings

Fifth Underground Operators' Conference 1992

Conference Proceedings

Fifth Underground Operators' Conference 1992

PDF Add to cart

Prospects for Single Pass Bolting (SPB) in Underground Hardrock Mining

Rock bolt installation is generally carried out in two steps. First the hole is drilled and the drill steel is extracted, then the bolt is inserted into the hole and tightened or grouted. With single pass bolting (SPB), however, these two steps can be carried out at the same time. This kind of bolting system has at least three advantages, (1) the time used for the bolt installation could be reduced, (2) the condition of safety for the operators could be improved, and (3) the degree of automation of the rock bolting practice could be increased. The study presented in this paper is concerned with the development of the SPB system. The current state of the system is discussed, and further improvement of the technique is explored.
Return to parent product
  • Prospects for Single Pass Bolting (SPB) in Underground Hardrock Mining
    PDF
    This product is exclusive to Digital library subscription
  • Prospects for Single Pass Bolting (SPB) in Underground Hardrock Mining
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1992
  • PDF Size: 0.489 Mb.
  • Unique ID: P199206019

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.