Conference Proceedings
Fifth Underground Operators' Conference 1992
Conference Proceedings
Fifth Underground Operators' Conference 1992
Prospects for Single Pass Bolting (SPB) in Underground Hardrock Mining
Rock bolt installation is generally carried out in two steps. First the hole is drilled and the drill steel is extracted, then the bolt is inserted into the hole and tightened or grouted. With single pass bolting (SPB), however, these two steps can be carried out at the same time. This kind of bolting system has at least three advantages, (1) the time used for the bolt installation could be reduced, (2) the condition of safety for the operators could be improved, and (3) the degree of automation of the rock bolting practice could be increased. The study presented in this paper is concerned with the development of the SPB system. The current state of the system is discussed, and further improvement of the technique is explored.
Contributor(s):
S Zhang, M G Dorricott
-
Prospects for Single Pass Bolting (SPB) in Underground Hardrock MiningPDFThis product is exclusive to Digital library subscription
-
Prospects for Single Pass Bolting (SPB) in Underground Hardrock MiningPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1992
- PDF Size: 0.489 Mb.
- Unique ID: P199206019