Primary Ore Milling at Pan Australian Mining Ltd Mt Leyshon Mine
Pan Australian Mining lid installed a milling and gold leaching plant designed to process 2 million tonnes per annum of breccia sulphide ore._x000D_
This plant was commissioned in January 1989. Since commissioning, increased ore reserves have been established and the plant has been expanded by the addition of one ball mill and several tanks to increase the design capacity to 3 million tonnes per annum. This additional plant was commissioned in May 1990, bringing the total number of mills up to three, each 4.5 m diameter x 7 m long. The paper details how milling rates have been increased at the expense of grind size to increase the capacity of the original plant from 2 million to 3.1 million tonne per year rate before the additional ball mill was Commissioned.
This plant was commissioned in January 1989. Since commissioning, increased ore reserves have been established and the plant has been expanded by the addition of one ball mill and several tanks to increase the design capacity to 3 million tonnes per annum. This additional plant was commissioned in May 1990, bringing the total number of mills up to three, each 4.5 m diameter x 7 m long. The paper details how milling rates have been increased at the expense of grind size to increase the capacity of the original plant from 2 million to 3.1 million tonne per year rate before the additional ball mill was Commissioned.
Contributor(s):
D Faulkener
-
Primary Ore Milling at Pan Australian Mining Ltd Mt Leyshon MinePDFThis product is exclusive to Digital library subscription
-
Primary Ore Milling at Pan Australian Mining Ltd Mt Leyshon MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1991
- PDF Size: 0.552 Mb.
- Unique ID: P199101021