Pan Australian Mining lid installed a milling and gold leaching plant designed to process 2 million tonnes per annum of breccia sulphide ore._x000D_
This plant was commissioned in January 1989. Since commissioning, increased ore reserves have been established and the plant has been expanded by the addition of one ball mill and several tanks to increase the design capacity to 3 million tonnes per annum. This additional plant was commissioned in May 1990, bringing the total number of mills up to three, each 4.5 m diameter x 7 m long. The paper details how milling rates have been increased at the expense of grind size to increase the capacity of the original plant from 2 million to 3.1 million tonne per year rate before the additional ball mill was Commissioned.
Return to parent product
  • Primary Ore Milling at Pan Australian Mining Ltd Mt Leyshon Mine
    PDF
    This product is exclusive to Digital library subscription
  • Primary Ore Milling at Pan Australian Mining Ltd Mt Leyshon Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1991
  • PDF Size: 0.552 Mb.
  • Unique ID: P199101021

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.