Conference Proceedings
Green Processing 2002 HC
Conference Proceedings
Green Processing 2002 HC
Conveying of Paste Backfill - Focusing on Zero Harm on the Environment at Cannington
The BHP Billiton Cannington Mine uses paste as the principal method of backfill. The paste consists of mine tailings and cement. The pastefill process at Cannington includes a surface plant where the thickened total tailings stream is filtered using two vacuum disc filters operating in parallel. The filter cake is mixed with Portland cement in a spiral mixer to produce a paste at a specified yield stress and cement content. The initial system design only required paste to be delivered under gravity. In July 2001, Cannington Mine expanded to 1.8 million tonnes per annum. In order to achieve this, production commenced on five new levels underground, 350 metres horizontally from the paste plant. Due to the high viscosity of paste, this distance was too far to transport by gravity. Traditionally, paste has been transported only short distances (50 m) using positive displacement pumps, with very limited success. At Cannington, a conveyor was installed which was designed to achieve zero spillage into the environment. This paper discusses the innovative design strategies used to attain zero harm on the environment whilst conveying a material, which is difficult to transport.
Contributor(s):
R Smith
-
Conveying of Paste Backfill - Focusing on Zero Harm on the Environment at CanningtonPDFThis product is exclusive to Digital library subscription
-
Conveying of Paste Backfill - Focusing on Zero Harm on the Environment at CanningtonPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2002
- PDF Size: 1.124 Mb.
- Unique ID: P200204040