Kopanang Mine Rail Haulage Tramming System
With the theme of - Underground Ore Handling System', Kopanang Mine completed an extensive project on a specific system with technologies for the handling of ore from a dedicated drawpoint to the shaft system. The intended rail haulage tramming system had to be capable of handling the shaft design and Life of Mine (LOM) requirements._x000D_
Kopanang is an AngloGold Ashanti gold mine situated in the province of the Free State in South Africa. In the Sotho language the name Kopanang' means to come together as a team. It's an appropriate name given that 25 companies worked on this project._x000D_
The future focus at Kopanang is to establish four mining levels between 3 to 4 km south-west of the shaft and two mining levels to the west. The mine has an expected life of almost 20 years and capital was approved in order to access this reserve to establish the infrastructure to handle the ore, hence this exclusive rail haulage tramming system of close to R40 million (SA rands), which took three years to construct._x000D_
Apart from the fact that this system had to be capable of handling 6500 t per shift at a depth of over 2 km over a length of 3.2 km, some of the major considering factors were: safety, economic factors with improved labour productivity, efficiency and reliability, risk termination, and ergonomics._x000D_
The system comprises two 20 t locomotives operating in a double header configuration from a dedicated draw point to a dedicated tip area for the reef and waste ore. With the objective of handling high speed and high capacity, this 200 t payload train is capable of running at 35 km/h powered from a 500 volt ac overhead line. Each loco consists of two 90 kW dc motors with ac/dc power conversion on the locomotive. For the system to operate at this speed, the rail system is constructed with Class 1 rails over the entire hauling distance. The tipping mechanism is unique and the span of 11 hoppers each with a load of close to 20 t is capable of tipping the pay load of 200 t in about 20 seconds hands free.
Kopanang is an AngloGold Ashanti gold mine situated in the province of the Free State in South Africa. In the Sotho language the name Kopanang' means to come together as a team. It's an appropriate name given that 25 companies worked on this project._x000D_
The future focus at Kopanang is to establish four mining levels between 3 to 4 km south-west of the shaft and two mining levels to the west. The mine has an expected life of almost 20 years and capital was approved in order to access this reserve to establish the infrastructure to handle the ore, hence this exclusive rail haulage tramming system of close to R40 million (SA rands), which took three years to construct._x000D_
Apart from the fact that this system had to be capable of handling 6500 t per shift at a depth of over 2 km over a length of 3.2 km, some of the major considering factors were: safety, economic factors with improved labour productivity, efficiency and reliability, risk termination, and ergonomics._x000D_
The system comprises two 20 t locomotives operating in a double header configuration from a dedicated draw point to a dedicated tip area for the reef and waste ore. With the objective of handling high speed and high capacity, this 200 t payload train is capable of running at 35 km/h powered from a 500 volt ac overhead line. Each loco consists of two 90 kW dc motors with ac/dc power conversion on the locomotive. For the system to operate at this speed, the rail system is constructed with Class 1 rails over the entire hauling distance. The tipping mechanism is unique and the span of 11 hoppers each with a load of close to 20 t is capable of tipping the pay load of 200 t in about 20 seconds hands free.
Contributor(s):
J J van Rensburg
-
Kopanang Mine Rail Haulage Tramming SystemPDFThis product is exclusive to Digital library subscription
-
Kopanang Mine Rail Haulage Tramming SystemPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2005
- PDF Size: 0.214 Mb.
- Unique ID: P200507025