Mine Hoists for the Nickel Rim South Project

This paper describes the design, manufacture and site services associated with the supply of mine hoists for the new mine under construction by Falconbridge Limited in Ontario, Canada. Two new shafts are being sunk, and the hoisting equipment at each shaft can be summarised as follows: Ventilation shaft: 4.66 m diameter double-drum second-hand hoist, originally in operation at San Manuel Mine, Arizona, to be used as the shaft sinking hoist. The second-hand hoist presented a challenge in that during its previous life, the hoist had been intensively operated during service at San Manuel Mine, and this paper describes the scope of refurbishment work undertaken, both electrically and mechanically, to ensure future reliable operation, together with the requirement to meet Canadian and Ontario regulations and codes of practice._x000D_
3.05 m diameter new single drum auxiliary hoist to be used as a second means of egress._x000D_
Main shaft: 4.57 m diameter new double-drum hoist to be used initially as the shaft sinking hoist, and subsequently to be converted to the equivalent of a single-drum multi-rope hoist for service duties during the production phase; 5.49 m diameter new double-drum hoist to be used for skip hoisting during the production phase; and 3.05 m diameter new single drum auxiliary hoist._x000D_
The new hoists are all designed to comply with SABS requirements such that hoisting with reduced rope safety factors will be possible in the future. This paper describes the principles involved both mechanically and electrically._x000D_
Particular attention is paid to the conversion of the main shaft service hoist from a double-drum sinking hoist to a multi-rope hoist._x000D_
This paper describes the ac electrical powertrains (drives and motors) used that eliminate the need for harmonic filters and reactive power compensation equipment since they exhibit no negative effects on the utility electrical network system._x000D_
This paper describes the logistical challenges of installing, commissioning and setting to work a series of five hoists in a short time frame.
Return to parent product
  • Mine Hoists for the Nickel Rim South Project
    PDF
    This product is exclusive to Digital library subscription
  • Mine Hoists for the Nickel Rim South Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2005
  • PDF Size: 5.347 Mb.
  • Unique ID: P200507029

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.