Skip to main content
Conference Proceedings

Metallurgical Plant Design and Operating Strategies (MetPlant) 2002

Conference Proceedings

Metallurgical Plant Design and Operating Strategies (MetPlant) 2002

PDF Add to cart

Ball Mill Circuit Optimisation at Mount Isa Lead/Zinc Concentrator for Grinding Cost Reduction

This paper presents a case study to reduce the operational cost on the secondary ball mill circuit in the Lead/Zinc Concentrator at Mount Isa Mines. The circuit includes two five-metre diameter ball mills each closed with a cluster of ten 15-inch cyclones. The operating cost for both ball mills is about six million Australian dollars per annum._x000D_
The concentrator achieves 75 per cent of the plant design capacity with one ball mill operating, but will have to use two ball mills when 100 per cent plant capacity is required._x000D_
The optimisation study on the circuit identified a new flowsheet that enabled the concentrator to reach 100 per cent of the capacity by using one of the two secondary ball mills. The success of the project utilised the existing equipment rationally and saved the operational cost for one ball mill at full concentrator capacity._x000D_
A further simplified secondary circuit is proposed using the IsaMill for the secondary grinding duty. Performance of the IsaMill circuit and the potential cost savings are predicted.
Return to parent product
  • Ball Mill Circuit Optimisation at Mount Isa Lead/Zinc Concentrator for Grinding Cost Reduction
    PDF
    This product is exclusive to Digital library subscription
  • Ball Mill Circuit Optimisation at Mount Isa Lead/Zinc Concentrator for Grinding Cost Reduction
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2002
  • PDF Size: 0.345 Mb.
  • Unique ID: P200202021

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.