Skip to main content
Conference Proceedings

Metallurgical Plant Design and Operating Strategies (MetPlant) 2002

Conference Proceedings

Metallurgical Plant Design and Operating Strategies (MetPlant) 2002

PDF Add to cart

The Influence of a Pipe Reactor to Improve Pre-Oxidation and Gold Recovery and Lower Cyanide Consumption

The general experience in gold cyanidation research activities and plant practice is that high oxygen and cyanide concentrations improve gold leaching kinetics which in turn reduce residence time and increase throughput. This paper shows how the improved pre-oxidation method for the pyrrhotite rich gold ore of Bounty Gold Mine has increased gold recoveries at lower reagent consumption rates. The installation of a pipe reactor, in conjunction with a Multi Mix Systems oxygen injector, has lowered the amount of oxygen required to achieve a dissolved oxygen level target of 20 mg/L. The improvement of the pre-oxidation stage and lead nitrate solution addition has led to a reduction in the free cyanide concentration required for leaching, resulting in a decrease in cyanide consumption rate by 36 per cent to achieve a one to two per cent improvement in the gold recovery.
Return to parent product
  • The Influence of a Pipe Reactor to Improve Pre-Oxidation and Gold Recovery and Lower Cyanide Consumption
    PDF
    This product is exclusive to Digital library subscription
  • The Influence of a Pipe Reactor to Improve Pre-Oxidation and Gold Recovery and Lower Cyanide Consumption
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2002
  • PDF Size: 0.67 Mb.
  • Unique ID: P200202005

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.