The Mount Gordon Pressure Leach Process - Continuous Improvements in Leaching Capacity and Electrowinning Utilisation

The Mount Gordon operation, consisting of the Esperanza open cut mine and the unique Mount Gordon Ferric Leach processing plant, is operated by Western Metals Copper Ltd at Mount Gordon, 125 km north east of Mt Isa. The processing plant treats predominantly the secondary copper sulphide minerals, chalcocite and covellite. The gangue consists of massive pyrite and a range of silicified siltstones. The processing plant utilises a conventional single stage SAG/cyclone milling circuit, followed by low-temperature/low-pressure autoclave oxidation to produce copper in solution. The pregnant leach solution is treated via conventional SX/EW technology to produce copper cathode. Currently the plant is operating at a nominal production rate of 48 500 tpa copper. The Mount Gordon Ferric Leach technology is the worlds first integrated pressure leach/SX/EW process to be used to treat copper sulphides on a full plant scale._x000D_
In the last six months, July to December 2001, the plant has emerged from a two-year postcommissioning phase to achieve steady state operation. This has been characterised by high plant availability and consistent production performance in excess of the name plate capacity of 45 000 tonnes. Production rates will continue to increase over the next 12 months to over 50 000 tpa via a planned process of incremental improvements._x000D_
The pressure leach circuit has consistently achieved availabilities exceeding 95 per cent over the past 18 months. Notwithstanding this, the leach circuit still has a much greater requirement for planned maintenance than SX/EW. For much of the Mount Gordon processing plant's operating life, the leaching process has constrained production. Recent developments arising from detailed mass and energy balance modelling have now significantly improved leach capability, resulting in the plant bottleneck being shifted to electrowinning. In order to balance the capabilities of the two circuits however, the surge capacity between leach and SX/EW was increased substantially. This effectively de-coupled the higher capability but lower availability leach circuit from the lower capability but higher availability SX/EW circuit. As a result, electrowinning utilisation has increased to in excess of 98 per cent, which is reflected in a higher overall plant throughput.
Return to parent product
  • The Mount Gordon Pressure Leach Process - Continuous Improvements in Leaching Capacity and Electrowinning Utilisation
    PDF
    This product is exclusive to Digital library subscription
  • The Mount Gordon Pressure Leach Process - Continuous Improvements in Leaching Capacity and Electrowinning Utilisation
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2002
  • PDF Size: 0.644 Mb.
  • Unique ID: P200202002

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.