Conference Proceedings
                        MetPlant 2011
Conference Proceedings
                            MetPlant 2011
IsaMill Design Improvements and Operational Performance at Anglo Platinum
                            
In 2003, Anglo Platinum, in a joint development with Xstrata Technology, installed the world's first 10 000 litre IsaMillTM in a concentrate regrind duty at the Western Limb Tailings Re-treatment Plant. The success of that installation was the enabling event for Anglo Platinum to proceed with a substantial investment in horizontal stirred milling technology. Since 2006 an additional three IsaMillsTM in concentrate regrind duties and a further 18 IsaMillsTM in the more technically challenging coarse grinding mainstream applications, have been commissioned in group Concentrator operations - bringing the total number of IsaMillsTM installed in Anglo Platinum plants to 22.A collaborative approach between Anglo Platinum and Xstrata Technology towards improving milling efficiency and reducing operating costs, through internal mill component wear optimization and operating recipe development, has resulted in further improvements in the overall success of IsaMillsTM in the flow sheets of many Anglo Platinum operations. The addition of IsaMillsTM in the Anglo Platinum flow sheets has improved plant PGM recoveries by as much as 5%.This paper explores the improvements made to the IsaMillsTM flow sheet and mill internal design and shares some of the operating experience with IsaMillsTM technology in Anglo Platinum._x000D_
FORMAL CITATION:Rule, C and de Waal, H, 2011. IsaMill Design Improvements and Operational Performance at Anglo Platinum, in Proceedings MetPlant 2011, pp 176-192 (The Australasian Institute of Mining and Metallurgy: Melbourne).
                    
                        FORMAL CITATION:Rule, C and de Waal, H, 2011. IsaMill Design Improvements and Operational Performance at Anglo Platinum, in Proceedings MetPlant 2011, pp 176-192 (The Australasian Institute of Mining and Metallurgy: Melbourne).
                                    
                                        Contributor(s):
                                    
                                    C Rule, H de Waal
                                
                            - 
                                                            SubscribeIsaMill Design Improvements and Operational Performance at Anglo PlatinumPDFThis product is exclusive to Digital library subscription
 - 
                                                            Add to cartIsaMill Design Improvements and Operational Performance at Anglo PlatinumPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
 
                                        
                                        PD Hours
                                    
                                    
                                        
                                            Approved activity
                                        
                                    
                                - Published: 2011
 - PDF Size: 1.999 Mb.
 - Unique ID: P201107016