Conference Proceedings
                        MetPlant 2011
Conference Proceedings
                            MetPlant 2011
The Wonawinta Silver Project - Value Engineering at Work
                            
The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner's team for feasibility, design, engineering, construction and commissioning.With a 51Moz resource CCR is one of the largest pure silver players in Australia. A probable reserve of 14.3Moz has been defined for a mine life of approximately five years. The silver mineralization is contained in host rock composed of clays and oxidized limestone. The ore also contains on average 1.3% lead as cerussite, and other minerals. A simple circuit consisting of slurrying of the ore, gravity treatment of the coarse fraction to recover lead, silver extraction using CIL, elution and the Merrill Crowe silver recovery process, has been developed.The value engineering approach to this development pioneered over the past decade by RMDSTEM has meant that RMDSTEM has delivered the bankable feasibility study at a cost of $0.07 per resource ounce. It is highly cost effective making efficient use of shareholders funds as well as being very time efficient. This paper describes the application of the value engineering approach to the development of the Wonawinta project._x000D_
FORMAL CITATION:Greenhill, P G, 2011. The Wonawinta Silver Project - value engineering at work, in Proceedings MetPlant 2011, pp 312-327 (The Australasian Institute of Mining and Metallurgy: Melbourne).
                    
                        FORMAL CITATION:Greenhill, P G, 2011. The Wonawinta Silver Project - value engineering at work, in Proceedings MetPlant 2011, pp 312-327 (The Australasian Institute of Mining and Metallurgy: Melbourne).
                                    
                                        Contributor(s):
                                    
                                    P G Greenhill
                                
                            - 
                                                            SubscribeThe Wonawinta Silver Project - Value Engineering at WorkPDFThis product is exclusive to Digital library subscription
 - 
                                                            Add to cartThe Wonawinta Silver Project - Value Engineering at WorkPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
 
                                        
                                        PD Hours
                                    
                                    
                                        
                                            Approved activity
                                        
                                    
                                - Published: 2011
 - PDF Size: 0.58 Mb.
 - Unique ID: P201107024