The Arrium IsaMill from Design through Commissioning and Optimisation

Arrium's magnetite concentrator has recently completed a modification program to improve the process that has been in operation in Whyalla, South Australia for the previous seven years. The magnetite concentrate is pumped via pipeline to the coast and serves as pellet plant feed, eventually being turned into steel in the Whyalla blast furnace. With the addition of a new 3MW IsaMill at the concentrator, the plant has seen increased production from a reduced feed grade, enabling Arrium to treat ores previously stockpiled as waste. This paper will focus on the design work and commissioning of the fine grinding circuit along with the year of optimisation that followed, taking the IsaMill up to 350+ tph of throughput.CITATION:Larson, M, Anderson, G, Mativenga, M and Stanton, C, 2015. The Arrium IsaMill from design through commissioning and optimisation, in Proceedings MetPlant 2015, pp 110-119 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • The Arrium IsaMill from Design through Commissioning and Optimisation
    PDF
    This product is exclusive to Digital library subscription
  • The Arrium IsaMill from Design through Commissioning and Optimisation
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2015
  • PDF Size: 1.454 Mb.
  • Unique ID: P201509009

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.