Blasting for Reduced Process Plant Costs at Argyle Diamond Mine
Mining of the AKI lamproite pipe at the Argyle Diamond Mine (ADM) commenced in 1985. Originally designed to mine ore at a rate of 3.6 Mt per annum, the project has gone through two major plant expansions to a designed production rate of 8.7 Mt
Contributor(s):
B Bulow, P Smallnone, B Walker
-
Blasting for Reduced Process Plant Costs at Argyle Diamond MinePDFThis product is exclusive to Digital library subscription
-
Blasting for Reduced Process Plant Costs at Argyle Diamond MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1998
- PDF Size: 1.193 Mb.
- Unique ID: P199804005