An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations

This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints have been considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times of equipment; equipment-assignment-dependent operation times of blocks; distances between each pair of blocks; due windows of blocks; material properties of blocks; swell factors of blocks; and slope requirements of blocks. It is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level. The model also provides an intelligent decision support tool to account for the availability and usage of equipment units for drilling, blasting and excavating stages.CITATION:Kozan, E and Liu, S Q, 2014. An Open pit multistage mine production scheduling model for drilling, blasting and excavating operations, in Proceedings Orebody Modelling and Strategic Mine Planning Symposium 2014 , pp 329-334 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations
    PDF
    This product is exclusive to Digital library subscription
  • An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2014
  • PDF Size: 0.384 Mb.
  • Unique ID: P201413036

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.