Skip to main content
Conference Proceedings

Project Development Symposium, Sydney

Conference Proceedings

Project Development Symposium, Sydney

PDF Add to cart

Cost Control in Project Development

In order to achieve optimum results for money spent in construction of new projects there is a need for mining developers to pay greater attention to cost control. Control is achieved by establishing a frame of reference, a method of checking and a means of remedial action. The frame of reference is a well coded set of budget estimates which graduate into definitive estimates as design is completed, backed up by drawings, specifications and bills of quantities. The method of checking is provided by cost engineering and quantity surveying input, at both feasibility study and design and documentation stages. Remedial action follows if the checking process reveals a need. In large complex projects where construction completion time is often of prime importance, control of costs can sometimes be relegated to second place. To avoid this it may be necessary to include specialists in cost control in project management teams. Quantity surveyors are trained specifically in construction economics and can provide develop- ers and project engineers with valuable support at all stages of construction.
Return to parent product
  • Cost Control in Project Development
    PDF
    This product is exclusive to Digital library subscription
  • Cost Control in Project Development
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1983
  • PDF Size: 0.148 Mb.
  • Unique ID: P198303007

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.