Heap Leaching at Camel Creek Mine

Camel Creek Mine operated by Lynch Mining Pty Ltd is located
65 km west of inghain and 160 kin north west of Townsville in
North Queensland. (Figure 1). The Camel Creek gold mineralisation was discovered in
mid-1987 in an area previously known for its tin workings.
Mining commenced in January 1989 after an oxide reserve of 1.2
million tonnes @ 2.1 g/t gold had been delineated. The first gold
pour was in May 1989. The mine developed into a medium sized open cut operation,
with full site facilities. The initial mining rate was 500 000 tpa
utilising run-of-mine (ROM) heap leaching to recover the gold. By the end of 1990 the wider orehodies were mined and efforts
were focused on the narrow orebodies, of width typically less
than three metres. Smaller earth moving equipment was
employed to selectively mine the narrow orehodies leading to a
decrease in the mining rate to 200 000 tpa. The Red Gold deposit (80 000 tonnes 3.0 g/t to 18 in
vertical) was mined in mid-1990 and ore was hauled
approximately 8 kin to the Camel Creek heap leach operation.
The ore was hauled in a dedicated campaign after being
stockpiled. The cost of dedicated ore haulage ensured that only
the more exceptional of the remote orebodies could be mined in
this manner. The Golden Cup orebody, some 20 km from Camel Creek, was
too distant to permit ore haulage. However, this prospect
contained sufficient gold (initially 90 000 tonnes @ 3.0 g/t) to
warrant the installation of a small mobile adsorption facility. Construction of the second heap leach operation commenced in
late-1990. Gold production commenced in early April 1991.
Mining of several smaller orebodies remote to the second heap
leach facility has been undertaken and further mining is planned. This paper outlines heap leaching practice at Camel Creek
Mine and summarises the success of the Golden Cup heap leach.
Return to parent product
  • Heap Leaching at Camel Creek Mine
    PDF
    This product is exclusive to Digital library subscription
  • Heap Leaching at Camel Creek Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1994
  • PDF Size: 0.739 Mb.
  • Unique ID: P199407010

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.