Conference Proceedings
Seam Gas Drainage with Particular Reference to the Working Seam, Wollongong
Conference Proceedings
Seam Gas Drainage with Particular Reference to the Working Seam, Wollongong
Methane Drainage Experience with Horizontal Boreholes in a Western Coalbed
The Bureau of Mines in cooperation with Kaiser Steel Corporation conducted two methane drainage studies in an advancing section of the Sunnyside No. I Mine where production was being severely hampered by methane emissions. A total of six horizontal aoreholes were completed during the studies to an average length of 291 meters. Total gas production from the boreholes as of December 1981 has exceeded 6,088,800 m3. Methane emissions into the section were reduced by 40 pct as a result of the first drainage system. The second drainage system is currently producing 11,328 m3/day from four Doreholes. Mining of the section and cementing of the horizontal horeholes is expected to begin within 2 Years.
Contributor(s):
G L Finfinger, J H Perry, R L King
-
Methane Drainage Experience with Horizontal Boreholes in a Western CoalbedPDFThis product is exclusive to Digital library subscription
-
Methane Drainage Experience with Horizontal Boreholes in a Western CoalbedPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1982
- PDF Size: 0.368 Mb.
- Unique ID: P198206018