Skip to main content
Conference Proceedings

Seam Gas Drainage with Particular Reference to the Working Seam, Wollongong

Conference Proceedings

Seam Gas Drainage with Particular Reference to the Working Seam, Wollongong

PDF Add to cart

Methane Drainage Experience with Horizontal Boreholes in a Western Coalbed

The Bureau of Mines in cooperation with Kaiser Steel Corporation conducted two methane drainage studies in an advancing section of the Sunnyside No. I Mine where production was being severely hampered by methane emissions. A total of six horizontal aoreholes were completed during the studies to an average length of 291 meters. Total gas production from the boreholes as of December 1981 has exceeded 6,088,800 m3. Methane emissions into the section were reduced by 40 pct as a result of the first drainage system. The second drainage system is currently producing 11,328 m3/day from four Doreholes. Mining of the section and cementing of the horizontal horeholes is expected to begin within 2 Years.
Return to parent product
  • Methane Drainage Experience with Horizontal Boreholes in a Western Coalbed
    PDF
    This product is exclusive to Digital library subscription
  • Methane Drainage Experience with Horizontal Boreholes in a Western Coalbed
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1982
  • PDF Size: 0.368 Mb.
  • Unique ID: P198206018

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.