Skip to main content
Conference Proceedings

Second International Future Mining Conference 2011

Conference Proceedings

Second International Future Mining Conference 2011

PDF Add to cart

Eco Underground Coal Mining Systems for Ultra-Thick Coal Seam - Utilisation of Flyash and CO2 Storage

EGAT Mae Moh Lignite Mine in Thailand produces about 16 Mt of lignite annually from open-cut mining. The coal is used to generate 2400 MW of electricity. In the near future, however, the coal must be extracted from underground at 400 - 500 m deep from the surface. The problem is the thickness of the coal seams. There are two coal seams that are about 25 m thick with 20 - 25 m of interburden between them.In order to investigate thick seam mining systems and propose a new mining system in ultra-thick coal seams in Thailand, a joint research group was established by Japanese and Thai researchers and mining engineers in early 2009. This paper describes conventional underground mining systems and underground coal gasification for thick coal seams and discusses the applicable coal mining systems to this mine. Then, this paper proposes an innovative underground coal mining system for thick coal seam, eco-friendly underground coal mining system which consists of the utilisation of flyash and CO2 storage'._x000D_
FORMAL CITATION:Hamanaka, A, Lin, N Z, Sasaoka, T, Shimada, H, Matsui, K and Takamoto, H, 2011. Eco underground coal mining systems for ultra-thick coal seam - utilisation of flyash and CO2 storage, in Proceedings Second International Future Mining Conference 2011, pp 121-130 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Eco Underground Coal Mining Systems for Ultra-Thick Coal Seam - Utilisation of Flyash and CO2 Storage
    PDF
    This product is exclusive to Digital library subscription
  • Eco Underground Coal Mining Systems for Ultra-Thick Coal Seam - Utilisation of Flyash and CO2 Storage
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2011
  • PDF Size: 3.127 Mb.
  • Unique ID: P201114019

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.