Mine Planning at the Mae Moh Lignite Mine Thailand
The Electricity Generating Authority of Thailand own and operate an opencut mine supplying coal to on-site power stations at Mae Moh, 600 km North of Bangkok. The mine is being expanded from an annual production of 1.5 million tonnes per year in 1982 to over 9.5 million tonnes per year by 1991. The mine will be amongst the largest open pit operations in the world._x000D_
It is technically difficult to operate and plan due to complex geology, weak strata and surface constraints including reservoirs, forests and traditional villages. This paper presents a case study of mine planning for the above project including associated collection and processing of geological and geotechnical information._x000D_
The existing operation is described, as well as the strategy adopted for the mine at expanded production. The planning covers various phases of mine planning including a Conceptual Study, a Definitive Study and detailed short term planning. Each stage incorporated new information and reflected a higher level of confidence in the data and resulting plan._x000D_
Sophisticated computer techniques were required including geological modelling, calculation of volumes, geotechnical analysis, scheduling and costing. The planning was undertaken on site by a team of Australian and Thai Engineers as part of the Thailand-Australia Lignite Mines Development Project which is a four year programme of assistance funded by the Australian Government.
It is technically difficult to operate and plan due to complex geology, weak strata and surface constraints including reservoirs, forests and traditional villages. This paper presents a case study of mine planning for the above project including associated collection and processing of geological and geotechnical information._x000D_
The existing operation is described, as well as the strategy adopted for the mine at expanded production. The planning covers various phases of mine planning including a Conceptual Study, a Definitive Study and detailed short term planning. Each stage incorporated new information and reflected a higher level of confidence in the data and resulting plan._x000D_
Sophisticated computer techniques were required including geological modelling, calculation of volumes, geotechnical analysis, scheduling and costing. The planning was undertaken on site by a team of Australian and Thai Engineers as part of the Thailand-Australia Lignite Mines Development Project which is a four year programme of assistance funded by the Australian Government.
Contributor(s):
P C Westcott
-
Mine Planning at the Mae Moh Lignite Mine ThailandPDFThis product is exclusive to Digital library subscription
-
Mine Planning at the Mae Moh Lignite Mine ThailandPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1986