Conference Proceedings
Seventh Underground Operators' Conference
Conference Proceedings
Seventh Underground Operators' Conference
An Overview of Current Planning and Production Systems at McArthur River Mine
McArthur River Mine is located approximately 50 km south-east of the NT township of Borroloola and approximately 120 km from the Gulf of Carpentaria. The mine hosts a series of layered shallow dipping tabular orebodies, with current reserves of approximately 22 Mt, grading 13.6 per cent zinc, 6.3 per cent lead and 65 g/t silver. Owing to economic considerations, the lower most orebody (No 2 orebody) has been selected for initial mine production. Following the completion of the No 2 orebody, mining will transfer to the lower grade and metallurgically more complex No 4 orebody. The mine employs a total of 235 people throughout the underground and surface areas. The majority of the workforce work a fly-in/fly-out, seven-day- on/seven- day- off roster with 12-hour shifts. Presently, a further 18 contractors are involved in trial mining areas. An apparent dip room and pillar technique has been selected as the primary mining method. Officially opened in September 1995, the current production rate of 1.2 Mt per annum will eventually escalate to 1.5 Mt per annum. Though most production is achieved through the use of conventional loaders, trucks and jumbos, the recent development of methods utilising scrapers, hand held machines and modified jumbos has produced encouraging results in steeper dipping areas of the mine. Initial production has been hindered by several factors including extensive and largely unpredictable faulting, worse than expected ground conditions and difficulties with some mining equipment. Compounded by the relatively thin 3 m ore seam, initial mining resulted in high dilution and poor production. This paper describes the development of unique planning and production systems that were evolved in order to overcome these problems and achieve the targeted production rates and head grade.
Contributor(s):
C M Stewart, M Gwynne
-
An Overview of Current Planning and Production Systems at McArthur River MinePDFThis product is exclusive to Digital library subscription
-
An Overview of Current Planning and Production Systems at McArthur River MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1998
- PDF Size: 0.741 Mb.
- Unique ID: P199803014