The Methodology Behind the Development of the Vera/Nancy Mine
Within ten months of the first significant intersection on the Vera deposit, approval was given to proceed with a $28.3 M underground development of the Vera-Nancy gold mine. Contrary to what the timeframe suggests, the development of the underground mine was planned in a logical and methodical manner which enabled confirmation of the resource, evaluation of the orebody for mining and sufficient production to recommence milling operations at the Pajingo treatment plant. This paper describes the underlying factors on which the project was planned and developed. The approach has successfully enabled the mine to be in production 18 months after discovery without compromising any future production or potential expansion
Contributor(s):
J McKinstry
-
The Methodology Behind the Development of the Vera/Nancy MinePDFThis product is exclusive to Digital library subscription
-
The Methodology Behind the Development of the Vera/Nancy MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1998
- PDF Size: 0.342 Mb.
- Unique ID: P199803030