Conference Proceedings
Strip Mining 45 Metres and Beyond, Central Queensland
Conference Proceedings
Strip Mining 45 Metres and Beyond, Central Queensland
Availability and Utilisation
Excavator output rates given in Makers' catalogues are sometimes based on favourable operating conditions. Mine operators and planners are more interested in the Effective Hourly Output in normal operation (Qe) a plant system can give hour by hour and year after year in a particular application. The number of hours mining plant will be available for normal operation will be less than the annual total of 8760 h. The number of the available hours which can be utilised at Qe will depend largely on the number and types of units in the plant system, the manners in which they are applied and the nature of the deposit in which they work. The emphasis herein is on continuous systems for deep stripping with BWE's as the primary excavator. Examples and suggestions are given for the annual hours at Qe for some BWE systems.
Contributor(s):
H C G Rodgers
-
Availability and UtilisationPDFThis product is exclusive to Digital library subscription
-
Availability and UtilisationPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1981
- PDF Size: 0.965 Mb.
- Unique ID: P198105005