A new portal and access drift was constructed by Concrete Constructions for BHP's Elouera Colliery, south of Wollongong._x000D_
The portal area at the base of the Illawarra Escarpment is in soft colluvium material, underlain by highly to moderately weathered sandstone. The area has a well documented history of slope movement or slope creep and one of the main criteria for the design was to minimise disturbance to the unstable slope by limiting the excavation for the portal establishment. This was achieved by incorporating a sloped headwall and gabion wingwalls to accommodate the anticipated creep and groundwater seepage._x000D_
Main features of the design process also included the provision of both primary and secondary support in a single shell application and the use of canopy tubes to provide support ahead of the tunnel face._x000D_
The active involvement of the designer during the construction phase and the flexibility of the design concept allowed changes to the support methodology to be carried out as excavation proceeded._x000D_
This paper describes the design process undertaken for portal establishment and access drift to cater for the variability of the exposed ground conditions along the drift alignment.
The portal area at the base of the Illawarra Escarpment is in soft colluvium material, underlain by highly to moderately weathered sandstone. The area has a well documented history of slope movement or slope creep and one of the main criteria for the design was to minimise disturbance to the unstable slope by limiting the excavation for the portal establishment. This was achieved by incorporating a sloped headwall and gabion wingwalls to accommodate the anticipated creep and groundwater seepage._x000D_
Main features of the design process also included the provision of both primary and secondary support in a single shell application and the use of canopy tubes to provide support ahead of the tunnel face._x000D_
The active involvement of the designer during the construction phase and the flexibility of the design concept allowed changes to the support methodology to be carried out as excavation proceeded._x000D_
This paper describes the design process undertaken for portal establishment and access drift to cater for the variability of the exposed ground conditions along the drift alignment.
Contributor(s):
E Carapetian, H Bleuler
-
Elouera Colliery Mine Access - Design of a Portal and Tunnel in Soft GroundPDFThis product is exclusive to Digital library subscription
-
Elouera Colliery Mine Access - Design of a Portal and Tunnel in Soft GroundPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1999
- PDF Size: 0.537 Mb.
- Unique ID: P199901012