Conference Proceedings
Tenth Australian Tunnelling Conference
Conference Proceedings
Tenth Australian Tunnelling Conference
Geotechnical Challenges and Requirements for the Subsurface Development: The Case History of the Brasilia Metro
Subsurface development requires some geotechnical conditions and challenges. Most of then are related to the compatibility between tunnelling system and surrounded ground conditions, and design criteria. Design criteria usually involve lining pressure and ground control of displacements. In order to fulfil these requirements, geotechnical parameters have to be obtained as well as construction aspects have to be taken into account for predicting the tunnel behaviour. The Brasilia Metro is presented as a case history illustrating the geotechnical conditions and challenges for its implementation. It is 42 km long, including tunnels excavated in collapsible porous soils by the New Austrian Tunnelling Method. The Brasilia porous clay presents some characteristics, which may lead to large deformations due to structural collapse. Empirical methods were calibrated for collapsible porous soils and then applied to predict tunnelling-induced settlements. Settlements due to soil structural collapse modify completely the expected settlement profile, increasing their values from the tunnel crown to the ground surface. Consequently, surface settlement trough volumes were also greater than the ground losses around the tunnel. In this case history, structural collapse of porous soils played an important role and must have been taken into account to predict correctly the settlement trough and profile. Numerical simulation has shown that settlement magnitudes due to structural collapse are strongly dependent on the soil stiffness reduction after collapse and the extent of the collapsible zone.
Contributor(s):
A P Assis
-
Geotechnical Challenges and Requirements for the Subsurface Development: The Case History of the Brasilia MetroPDFThis product is exclusive to Digital library subscription
-
Geotechnical Challenges and Requirements for the Subsurface Development: The Case History of the Brasilia MetroPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1999
- PDF Size: 0.364 Mb.
- Unique ID: P199901052