Conference Proceedings
The AusIMM Centenary Conference - Mining: Our Heritage - Our Future
Conference Proceedings
The AusIMM Centenary Conference - Mining: Our Heritage - Our Future
Smelting Practice at Olympic Dam
The Olympic Dam smelter utilises Outokumpu Oy, flash smelting
technology to produce blister copper direct from high grade copper
concentrate.
This paper describes the unit processes involved, including
filtering/drying, materials handling, smelting, gas/dust handling, waste
heat recovery, sulphur fixing, anode refining and casting.
technology to produce blister copper direct from high grade copper
concentrate.
This paper describes the unit processes involved, including
filtering/drying, materials handling, smelting, gas/dust handling, waste
heat recovery, sulphur fixing, anode refining and casting.
Contributor(s):
D W Rich
-
Smelting Practice at Olympic DamPDFThis product is exclusive to Digital library subscription
-
Smelting Practice at Olympic DamPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1993
- PDF Size: 0.627 Mb.
- Unique ID: P199302032