Skip to main content
Conference Proceedings

The AusIMM Proceedings 1902

Conference Proceedings

The AusIMM Proceedings 1902

PDF Add to cart

Different Methods of Alluvial Mining in Victoria

Amongst representative men directing alluvial mining of erations in Victoria, some difference of opinion exists as to the best system of working the deep leads. The developmental operations of shaft-sinding, extending a reef drive, partially watering and rising up into the wash dirt are practically the same on all fields but subsequent mining is continued either on the Chiltern and Rulberglen or Ballarat systems, the latter being referred to by the Chiltern and Rutherglen miners as the "down country" system. In the former, the leading wash and cross drives are lept from 300 to 500 feet ahead of the reef drive, and in the latter the reverse method keeping the reef drive well ahead of all wash workingsis adopted.In the majority of alluvial mines in the southern and western fields, the initial work of defining the course of the lead is costly, owing to the thick superincumbent layers of hard basalt, to bore which costs from 9/- to 15/ per foot. Unfortunately large sums of money have been wasted in this work, owing to a want of care and knowledge in the selection of bore sites, and improper recording of the strata pierced, thus handicapping alluvial mining and bringing boring operations...
Return to parent product
  • Different Methods of Alluvial Mining in Victoria
    PDF
    This product is exclusive to Digital library subscription
  • Different Methods of Alluvial Mining in Victoria
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1901
  • PDF Size: 0.208 Mb.
  • Unique ID: P_PROC1902_0063

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.