Skip to main content
Conference Proceedings

The AusIMM Proceedings 1921

Conference Proceedings

The AusIMM Proceedings 1921

PDF Add to cart

Description of New Plant at South Mine, Broken Hill

JUST prior to the war the Broken Hill South Ltd: raised, on the average, 6628 tons of ore per week, all of which was crushed and treated in the 4-section gravity mill and the slime flotation plant, for the recovery of lead concentrate carrying silver. The sandy residues from that treatment were railed to the treatment plant of the Amalgamated Zinc (De Bavay's) Ltd. for the recovery of zinc concentrate by flotation, on the joint account of both companies. Subsequent to that-since 1916-approximately 1000 tons of old dump slime were also treated weekly for the recovery of lead and silver as slime-lead concentrate.PLANT CAPACITYUnder this programme the Babcock and Wilcox boiler plant of 8 boilers was taxed to such an extent as to call for the installation of two additional boilers, each of 2690 sq. ft. of heating surface and 55 sq. ft. chain-grade area.The electric generators and the air compressors of the old powerplant were also loaded to their maximum capacity. In view of the fact that the old power-plant had been added to from time to time since 1901, and that further extension was notpossible, and as it was not, moreover, an economical arrangement, the whole question of power generation was reconsidered. The considerations that determined the installation of entirely new plant were as follows:(1) The need for more compressed air for underground work and more electric current for the extension of the slime-flotation plant for the recovery of zinc, as well as lead, as slime concentrates. Provision of additional power was also deemed advisable for the...
Return to parent product
  • Description of New Plant at South Mine, Broken Hill
    PDF
    This product is exclusive to Digital library subscription
  • Description of New Plant at South Mine, Broken Hill
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1920
  • PDF Size: 1.668 Mb.
  • Unique ID: P_PROC1921_0252

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.