Coal Transport by Automatic Rope Haulages at the Brown Coal Workings of the State Electricity Commission at Yallourn, Victoria

GENERALTHE coal deposit, where it is being worked, consists of a bed of brown coal varying in thickness from 120 ft. to 200 ft., covered by an overburden of clay, drift, loam, etc., of a thickness of 22 ft. to 40 ft., and averaging 28 ft.The overburden is first entirely removed from the coal, and then the coal is excavated by. large revolving shovels which work at the bottom of the hole or open cut in the coal and deliver it in shovel bucketfuls to the transport system. The shovels owned by the Commission and available for this coal excavation are two Bucyrus steam revolving shovels, one being type 150B, weighing 150 tons, having a 21-cub. yd. bucket, and capable of digging a 47-ft. face; and the other being type 175B, weighing200 tons, having a 31-cub. yd. bucket, and capable of digging a 61-ft. face.In addition to these two steam shovels, the Commission has recently obtained a No. 250 Ruston electric revolving shovel weighing 340 tons, and having a bucket of 10 cub. yd. capacity, and capable of digging a 75-ft. face. When this electric shovel has been erected it will replace the steam shovels on the coal excavation, and the permanent transport system has been designed to take delivery of the coal from its bucket.The duty to be performed by the transport system is to take the coal from the shovels, elevate it out of the open cut, transport it to the screening house, deliver it iuto the hoppers at the top of this building, then to take the coal after it has passed over the screens and distribute the required grades to the power house and to the briquetting plant.
Return to parent product
  • Coal Transport by Automatic Rope Haulages at the Brown Coal Workings of the State Electricity Commission at Yallourn, Victoria
    PDF
    This product is exclusive to Digital library subscription
  • Coal Transport by Automatic Rope Haulages at the Brown Coal Workings of the State Electricity Commission at Yallourn, Victoria
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1923
  • PDF Size: 5.054 Mb.
  • Unique ID: P_PROC1924_0294

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.