Conference Proceedings
The AusIMM Proceedings 1924
Conference Proceedings
The AusIMM Proceedings 1924
Design of Reinforced Concrete Chimney at Yallourn Briquetting Works
THE Yallourn chimney has aroused interest, as it is, for the time being, the tallest structural erection in Australia. Its height was not decided on, however, with the object of breaking records, but is purely incidental to the purpose which it serves. Theboiler plant at the briquetting works (first instalment) consists of five Babcock and Wilcox land-type water-tube boilers, each of 4510 sq ft. heating su:race and 225 sq. ft. grate area in the form of step grates. Four boilers will normally produce 73,000 lb. of steam per hour at a gauge pressure of 265 lb. and a temperature of 6500 F., the fifth boiler being a reserve. Each boiler will consume about 100 tons of Yallourn coal per 24 hours. Provision is made for future installation of economizers, should it be found desirable. Designing for this condition, and allowing for a waste gas temperature of 3500 F. and an air temperature exceeding 1000 it was found necessary to have a draft of about 1.3 in. (water gauge) at the base of the chimney, and to deal with about 2000 cub. ft. of gases per second. Estimates were made of the cost of providing the necessary draught by means of fans and by means of a tall chill).ney. The annual charges of the two methods differed only slightly, and the tall chimney wasselected as being the more general practice in briquetting factories.Estimates were prepared for brick and concrete chiIlllleys. Yallourn bricks at that time were hand-made, and, while very suitable for domestic work, were not capable of withstanding high compressive stresses. The chimney design to suit these bricks thus required to be on very ample lines, resulting in high cost. Machine-made bricks from Melbourne would cost about 5 10s. per thousand on the site, with extra for radials, so that high cost again resulted. On the score...
Contributor(s):
A L Galbraith
-
Design of Reinforced Concrete Chimney at Yallourn Briquetting WorksPDFThis product is exclusive to Digital library subscription
-
Design of Reinforced Concrete Chimney at Yallourn Briquetting WorksPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1923
- PDF Size: 0.944 Mb.
- Unique ID: P_PROC1924_0296