Conference Proceedings
The AusIMM Proceedings 1927
Conference Proceedings
The AusIMM Proceedings 1927
Installation of Endless-Rope Haulage System Under Adverse Conditions
IT is generally accepted that for transport of coal underground from different collecting stations, the system of endless rope haulage with remote control is not only one of the safest and most economIcal, but is also one of the most'efficlent in dealing with output.When the coal measures lie in regular planes, the work of laying down such a haulage presents no difficulties. When, however, the dip of the measures is Irregular, or dislocated by faulting, the management is faced with the problem of constructing vertical curves of such a radius that the sag of the rope will correspond with the road bed, and thus obviate the danger of the rope rising and throwing the skips off the track.The direction of the main roads for haulage purposes being ascertained from the plan of the royalty to be worked, the faults or dislocations in the seam are determined for these roads with the greatest possible accuracy by means of bore holes from the surface.From the data thus obtained the haulage road can generally be so graded that the rope will keep on the floor during haulage operations, although the grades may in places be synclinal.The writer confesses that he knows of no accurate formula for calculating the sag of the rope under varying tensions and so determining the safe radius of the curve, and he had to depend upon past experiences under somewhat sImilar conditions.The accompanying sections illustrate a case where the writer has recently installed an endless rope underground approximately 5000 ft. in length, from the foot of a tunnel in which an endless rope delivers the output to the screening plant, and having to negotiate, first a 400-ft. downthrow fault, and later a 32 ft. upthrow.
Contributor(s):
J McLeish
-
Installation of Endless-Rope Haulage System Under Adverse ConditionsPDFThis product is exclusive to Digital library subscription
-
Installation of Endless-Rope Haulage System Under Adverse ConditionsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1926
- PDF Size: 0.207 Mb.
- Unique ID: P_PROC1927_0327