Conference Proceedings
The AusIMM Proceedings 1932
Conference Proceedings
The AusIMM Proceedings 1932
Description of Continuous Lead Refinery at the Works of the Broken Hill Associated Smelters Proprietary Limited, Port Pirie, South Australia
In the new refinery, at the works of the Broken Hill Associated Smelters Proprietary Limited, situated at Port Pirie, South Australia, the refining routine is similar to that carried on in the old one in that bullion is progressively refined first for arsenic and antimony, then for copper and gold, then for silver, and finally for zinc. However, actual procedure differs in that each refining operation is now conducted continuously, whereas in the old refinery intermittent batch treatment was practised.The early experimental work was concerned solely with the development of the continuous desilverising process, which, in addition to continuous treatment, embraces the novel feature of conjugate solution formation with consequent production of a silver product relatively high in silver and low in lead.
Contributor(s):
G K Williams
-
Description of Continuous Lead Refinery at the Works of the Broken Hill Associated Smelters Proprietary Limited, Port Pirie, South AustraliaPDFThis product is exclusive to Digital library subscription
-
Description of Continuous Lead Refinery at the Works of the Broken Hill Associated Smelters Proprietary Limited, Port Pirie, South AustraliaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1931
- PDF Size: 3.645 Mb.
- Unique ID: P_PROC1932_0380