Conference Proceedings
The AusIMM Proceedings 1939
Conference Proceedings
The AusIMM Proceedings 1939
Re-Forging and Heat Treatment of Jackbits
The Electrolytic Zinc Company of Australasia Limited commenced productive operations during February, 1936, at the- Rosebery and Hercules mines, which are situated near Rosebery, Tasmania. At this time it was decided that before re-organizing the steel sharpening shop a test should be made of the relative merits of conventional drill-steel and detachable bits. For this purpose Ingersoll-Rand type"I" thread centre hole.jackbits were selected and seventy-two of these were tested against conventional steel. Results indicated that, under the conditions pertaining at these mines, j ackbits should prove more economical than conventional drill-steel bits, and that a large-scale test, under working conditions, should be made. This was done by gradually replacing conventional drill-steel with jackbits at the Rosebery mine. Results were satisfactory and by the end of 1936 both mines were using only the jackbits.
Contributor(s):
F G Burn, R R McGhie, F Larkin, E Farrer
-
Re-Forging and Heat Treatment of JackbitsPDFThis product is exclusive to Digital library subscription
-
Re-Forging and Heat Treatment of JackbitsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1938
- PDF Size: 2.797 Mb.
- Unique ID: P_PROC1939_0474