Conference Proceedings
The AusIMM Proceedings 1941
Conference Proceedings
The AusIMM Proceedings 1941
Drill Steel Sharpening Practice at Lake View and Star Gold Mine
The drill steel' sharpening shop, which stands adjacent to the Chaffers shaft, is built to the dimensions of 110 ft. 9 in. by 58 ft. wide, and is air conditioned in order to maintain reasonable working conditions during the summer months.Figure 1 is a plan of the shop, showing the disposition of the machines and equipment.LIST OF STEEL SHOP EQUIPMENTAir Conditioning Plant comprising:-1 Spray and Eliminator Type Air Cooler, 6' ft. x 7 ft. x 6 ft. with 80 fine sprays.1 No. 36 Keith type ER. Ball Bearing upcast multivane centrifugal fan.20,000 cfm. a in. WG. at 450 r.p.m.Fan motor, A.G.E. S.C. 10 h.p. 1,160 r.p.m.1 Water Pump. 2?!-3-in. Thompson Class G. Single Stage Centrifugal Pump.1 Pump Motor, A.G.E. S.C. 70 h.p. 1,160 r.p.m.Drill Steel Sharpening Equipment:-2 Holman Sharpening Machines, No. 11.1 Ingersoll Rand Sharpening Machine, No. 54.5 Ingersoll Rand Sharpening Machines, No. 50.2 Holman Hot Millers, Type DM. Double Spindle Machines.2 Morgan Hot Millers, Type 1.6 Reamers consisting of motors with Ingersoll Rand Chuck fitted to the shaft and carrying a reamer of i-in. square Ultra Capital Steel Motors, A.G.E. S.C. 1 h.p. 1,160 r.p.m.4 Double-sided Drill Sharpening Furnaces, oil fired with L.P. "Major" 2-in. non-rotary whirl type burners.Combustion Chamber, 2 ft. 4 in. x 6 in. x 12 in. Oil consumption, 33 to 38 gallons per hour.Furnace Lining, Standard Kyanite.Firebricks, 9 in. x 3 in. x 4 in.2 Moving Frame type double-sided tip hardening furnaces, oil fired using High Pressure Air reduced to 3 lb. per square inch.Combustion Chamber, 3 ft. 5 in. x 5 in. x 16 in.Burners, "Major" L.P. 2-in. non-rotary whirl type.Oil consumption, 33 to 3'8 gallons per hour.Furnace lining-bottom and sides, 60 only 9 in. x 3 in. x 4 in. Kyanite bricks.
Contributor(s):
L E Elvey
-
Drill Steel Sharpening Practice at Lake View and Star Gold MinePDFThis product is exclusive to Digital library subscription
-
Drill Steel Sharpening Practice at Lake View and Star Gold MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1940
- PDF Size: 0.417 Mb.
- Unique ID: P_PROC1941_0520