Two of the problems long associated with the complete extraction of level pillars in the wide ore bodies of Broken Hill have been: (1) The high cost of maintaining level gangways through areas of slow subsidence to provide adequate trucking roads for the transport of sand filling; and (2) The difficulty and high cost of completely filling depleted areas. This paper deals with the experiments conducted to devise an apparatus for transporting, with the aid of compressed air, sandfill from the underground sand passes to the stopes and describes the sand blower which has been developed. This apparatus has to a large degree overcome the difficulties and removed much of the hazard associated with the rapid extraction of level pillars.Special attention is drawn to the sizing analysis of the sand and to the fact that it is not dry material. It was early found that these factors were determinants in the design and development of the apparatus described.Acknowledgment is made to the General Manager of Broken Hill South Limited for permission to present this paper, to the engineering department for assisting in the design of the apparatus, and to the underground staff for their co-operation in training the operators and in bringing to success this method of stope filling.PREVIOUS FILLING METHODSThe South Mine, with a monthly production of approximately 32,000 tons of lead-sHver-zinc sulphide ore by cut-and-fill mining methods, requires about 11,000 cubic yards of filling per month. With the exception of a small and variable quantity of developmental mullock, all this filling is...
Contributor(s):
A B Black
-
Pneumatic Stowing of Mill Residues in Underground Stopes, Broken Hill South LimitedPDFThis product is exclusive to Digital library subscription
-
Pneumatic Stowing of Mill Residues in Underground Stopes, Broken Hill South LimitedPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1940
- PDF Size: 1.19 Mb.
- Unique ID: P_PROC1941_0525