Conference Proceedings
The AusIMM Proceedings 1946
Conference Proceedings
The AusIMM Proceedings 1946
The 2,600 Feet Level Exploratory Drive North at North Broken Hill Limited
CONTENTSIntroductionNorthern ExplorationDrive ConceptionGeneralDriving CrewDrive Cross Section and Track DetailsVentilation by Electrically Driven FanTemperatures and HumidityFan PerformanceRock Drill Carriage and Rock DrillsStandard Drilling RoundElectric Firing from Power MainsExplosives and DetonatorsCharging and FiringMechanical Loading and Electric HaulageOperating CycleStatisticalEquipmentAcknowledgementINTRODUCTION.The driving project described in :this paper is one of greater magnitude than usual for the Broken Hill field, and in the execution of the work a departure was made from long-established local practice by the introduction of mechanisation. The primary object of the drive is to provide sites for gaining information regarding the behaviour of the ore-bodies well beyond the limits of the present exposures.Due to thermal conditions, the major portion of the work was done on a six-hour shift basis, in contrast to the normal one of seven hours, with a five-day week.
Contributor(s):
H H Bampton
-
The 2,600 Feet Level Exploratory Drive North at North Broken Hill LimitedPDFThis product is exclusive to Digital library subscription
-
The 2,600 Feet Level Exploratory Drive North at North Broken Hill LimitedPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1945
- PDF Size: 1.899 Mb.
- Unique ID: P_PROC1946_0604