Skip to main content
Conference Proceedings

The AusIMM Proceedings 1946

Conference Proceedings

The AusIMM Proceedings 1946

PDF Add to cart

The 2,600 Feet Level Exploratory Drive North at North Broken Hill Limited

CONTENTSIntroductionNorthern ExplorationDrive ConceptionGeneralDriving CrewDrive Cross Section and Track DetailsVentilation by Electrically Driven FanTemperatures and HumidityFan PerformanceRock Drill Carriage and Rock DrillsStandard Drilling RoundElectric Firing from Power MainsExplosives and DetonatorsCharging and FiringMechanical Loading and Electric HaulageOperating CycleStatisticalEquipmentAcknowledgementINTRODUCTION.The driving project described in :this paper is one of greater magnitude than usual for the Broken Hill field, and in the execution of the work a departure was made from long-established local practice by the introduction of mechanisation. The primary object of the drive is to provide sites for gaining information regarding the behaviour of the ore-bodies well beyond the limits of the present exposures.Due to thermal conditions, the major portion of the work was done on a six-hour shift basis, in contrast to the normal one of seven hours, with a five-day week.
Return to parent product
  • The 2,600 Feet Level Exploratory Drive North at North Broken Hill Limited
    PDF
    This product is exclusive to Digital library subscription
  • The 2,600 Feet Level Exploratory Drive North at North Broken Hill Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1945
  • PDF Size: 1.899 Mb.
  • Unique ID: P_PROC1946_0604

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.